GUYS WILL ring the gate bell tomorrow about 8:30 a.m. — they wanted to come even earlier, but I said no — to add a drain hole to the upstairs terraza.

When the floor on the upstairs terraza was built in 2003, the then-guys were not aware that it would be an open space, so the floor is completely level. And then it was left open to the elements. When it rained, a sizable lake formed on the floor and stayed for months, which was one reason we decided to cover it entirely last year.

There have long been two drain holes, but they don’t work for two reasons. One is that they are tiny. The other is that the floor is level, not even slightly tilted to the drain holes. The glass roof has eliminated most of the flooding problem but not entirely, especially when the rain blows from the sole direction where there is no canvas curtain.

The direction you see in the top photo.

The guys will cut a low, 18-inch-wide space in the terraza’s brick wall at floor level, and that will let me sweep the rainwater to the other side where it will fall to the ground.

There is nothing a Mexican brick mason cannot make right.

hole
One of the two useless holes we now have.

2 thoughts on “Adding a new hole

  1. I need something similar on the covered portion of my deck. I will be looking into this. The slope in the floor leads to the back wall unintentionally, I think, but there is an area that it can drain outside the wall with some hammering and chiseling.

    Like

Comments are closed.